DT493 Project/Cost type group Bis DB 39.5.0

From DB version 39.5.0, the assignments of the cost type groups to the projects are administrated in DT281.

DI005033 Project ID

Technical ID of the project. It is generated automatically upon creation of the project and cannot be changed afterwards, unlike the functional ID. It is usually invisible in the modules.

DI005034 Cost type group

ID of the cost type group

DI006348 Budget

Approved budget of the project per cost type group

DI028473 Planned

Planned costs of the project by cost type groups

DI028474 Actual

Actual costs of the project per cost type group

DI028475 Remaining

Remaining costs of the project per cost type group

DI028476 Total

Total costs of the project per cost type group

DI029099 Cost type group name

Name of the cost type group

DI057620 Project name

Name of the respective project

DI057636 493: OLAP 1 - txt

DI057701 Project

Functional ID of the project. It is generated automatically (copied from the technical Project ID) when creating a task. Unlike the technical Project ID, the functional ID can be changed manually.

DI006308 Actual load

DI006309 Planned load

DI006310 Remaining load

DI006311 Total load

DI006316 Summarized actual load

DI006317 Summarized planned load

DI006318 Summarized remaining load

DI006319 Summarized total load