The documentation from version 39.5.17 of PLANTA project can be found in the new PLANTA Online Help.

Assign Status Report MOD009C1W New from DB 39.5.10

Access path

From DB 39.5.12

  • Portfolio panel Status NEW Select status report button in the line of the required planning object Assign Status Report
  • Portfolio panel Simulations NEW Select status report button in the line of the required planning object Assign Status Report

Up to DB 39.5.12

  • Portfolio panel Status Assign a status report to the planning object button in the line of the required planning object Assign Status Report
  • Portfolio panel Simulations Assign a status report to the planning object button in the line of the required planning object Assign Status Report
  • Information

    • This module is an auxiliary module (selection module) and therefore it has no stand-alone function. It is used to assign status reports to the planning object of the portfolio, the data of which is required for the creation of a portfolio status report or of a portfolio simulation.

    Procedure

    From DB 39.5.12

    • When the module is opened, all released status reports of the selected planning object are listed.
    • Activate the NEW Select checkbox for the required project and click on the Assign selected status report button.

    Up to DB 39.5.12

  • When the module is opened, all released status reports of the selected planning object are listed.
  • Click on the link on the ID of the required status report or on the report name. As a result, the status report is automatically assigned to the previously selected planning object.
  •          PLANTA project









     
    • Suche in Topic-Namen

    • Suche in Topic-Inhalten
    This site is powered by the TWiki collaboration platform Powered by Perl