The documentation from version 39.5.17 of PLANTA project can be found in the new PLANTA Online Help.

DT810 Risk

DI007696 Project ID

ID of the project

DI007697 Risk

ID of the risk

New from DB 39.5.7

Details
  • In the Risks/Opportunities (Projects) and Risks/Opportunities (Programs) modules, a traffic light is implemented on the opportunity ID, which switches to red, yellow, or green depending on the values in the Damage extent and Probability of occurrence parameters. The opportunities are also sorted in accordance with the values in the parameters mentioned (ascending from highest to lowest).

DI007709 Active

Parameter, indicating whether the risk is active

Values

  • Checked - The risk actually exists.
    • Active risks are
      • considered in the calculation of the probable risk of a particular project.
      • displayed in the info board.
      • shown in the status report (with all measures).
  • Unchecked - Data is only used for documentation/preparation.

Note

The parameter can be edited by users with modification rights in the following modules:

From DB 39.5.13

From DB 39.5.10

  • Risks/Opportunities (Projects, NEW Proposals, NEW Ideas)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals)
  • Up to DB 39.5.10

  • Risks/Opportunities (Projects)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals) modules,
  • DI007710 Risk name

    Name of the risk

    The parameter can be edited by users with modification rights in the following modules:

    From DB 39.5.13

    From DB 39.5.10

  • Risks/Opportunities (Projects, NEW Proposals, NEW Ideas)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals)
  • Up to DB 39.5.10

  • Risks/Opportunities (Projects)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals) modules,
  • DI007711 Category

    Risk category

    Values

    • Date
    • Costs
    • Quality

    The parameter can be edited by users with modification rights in the following modules:

    From DB 39.5.13

    From DB 39.5.10

  • Risks/Opportunities (Projects, NEW Proposals, NEW Ideas)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals)
  • Up to DB 39.5.10

  • Risks/Opportunities (Projects)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals) modules,
  • DI007712 Possible damage

    Estimated monetary value of the gross profit which can occur as a result of the risk

    The parameter can be edited by users with modification rights in the following modules:

    From DB 39.5.13

    From DB 39.5.10

  • Risks/Opportunities (Projects, NEW Proposals, NEW Ideas)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals)
  • Up to DB 39.5.10

  • Risks/Opportunities (Projects)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals) modules,
  • DI007713 Probability

    Probability of occurrence of the damage in %

    The parameter can be edited by users with modification rights in the following modules:

    From DB 39.5.13

    From DB 39.5.10

  • Risks/Opportunities (Projects, NEW Proposals, NEW Ideas)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals)
  • Up to DB 39.5.10

  • Risks/Opportunities (Projects)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals) modules,
  • DI007714 Linked file

    In this field you can create a link to a file.

    Insert file

    • Right-click on the Linked file field and select the Insert context menu command.
    • Click on the Search button in the Insert hyperlink window.
    • Select the required file and click on the Open button.
    • Confirm with OK.
    • Save.
    Details
    • It is also possible to drag files from e.g. Window Explorer to the data field for documents using Drag & Drop.

    DI007715 Probable damage

    The value calculated from the possible damage and the likelihood of its occurrence (possibly reduced by the measures) including open measure costs. Is only displayed for risks with activated Active checkbox.

    Calculation
    ((Probability + Relative risk reduction) * 0.01) * Possible damage + Relative measure costs

    Notes

    • If the sum of measure reduction values exceeds the probability of damage specified in the risk, the probability of damage is set to 0% in the calculation of the probable damage, which, however, is not explicitly visible on the surface.
    • Even if the probability of damage obtained by the measures can be reduced to 0%, the probable damage does not necessarily have to be 0 since the costs of the measure are included in the calculation.

    Examples

    Possible damage Probability Relative risk reduction Relative measure costs Probable damage
    Case 1: 10.000 50 % - - 5.000
    Case 2: 10.000 50 % 20 % 1.000 4.000
    Case 3: 10.000 50 % 20 %
    40 %
    1.000
    1.000
    2.000

    DI028260 Actual damage

    Actual monetary value of the damage caused by occurrence of the risk

    The parameter can be edited by users with modification rights in the following modules:

    From DB 39.5.13

    From DB 39.5.10

  • Risks/Opportunities (Projects, NEW Proposals, NEW Ideas)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals)
  • Up to DB 39.5.10

  • Risks/Opportunities (Projects)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals) modules,
  • DI026062 Description

    Decription of the risk. Unlike the name, a longer text can be entered here.

    The parameter can be edited by users with modification rights in the following modules:

    From DB 39.5.13

    From DB 39.5.10

  • Risks/Opportunities (Projects, NEW Proposals, NEW Ideas)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals)
  • Up to DB 39.5.10

  • Risks/Opportunities (Projects)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals) modules,
  • DI028258 Incurred on

    Date on which the damage occurred

    The parameter can be edited by users with modification rights in the following modules:

    From DB 39.5.13

    From DB 39.5.10

  • Risks/Opportunities (Projects, NEW Proposals, NEW Ideas)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals)
  • Up to DB 39.5.10

  • Risks/Opportunities (Projects)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals) modules,
  • DI028259 Completed on

    Date on which the risk was completed

    The parameter can be edited by users with modification rights in the following modules:

    From DB 39.5.13

    From DB 39.5.10

  • Risks/Opportunities (Projects, NEW Proposals, NEW Ideas)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals)
  • Up to DB 39.5.10

  • Risks/Opportunities (Projects)
  • Risks/Opportunities (Programs)
  • Risks/Opportunities (Ideas and Proposals) modules,

  • From DB 39.5.13

    DI063820 Damage extent

    Parameter for the evaluation of the height of the monetary damage. The evaluation is done by three categories: low, medium, high. The value is used together with the Probability of occurrence value for the graphical evaluation in a matrix diagram.

    The parameter can be edited by users with modification rights in the following modules:

    From DB 39.5.10

    DI063820 Damage extent

    Parameter for the evaluation of the height of the monetary damage. The evaluation is done by three categories: low, medium, high. The value is used together with the Probability of occurrence value for the graphical evaluation in a matrix diagram.

    The parameter can be edited by users with modification rights in the following modules:

    New from DB 39.5.7

    DI063820 Damage extent

    Parameter for the evaluation of the height of the monetary damage. The evaluation is done by three categories: low, medium, high. The value is used together with the Probability of occurrence value for the graphical evaluation in a matrix diagram.

    The parameter can be edited by users with modification rights in the following modules:


    From DB 39.5.13

    DI063823 Probability of occurrence

    Parameter for the evaluation of the probability of the monetary damage. The evaluation is done by three categories: low, medium, high. The values of the parameter are used together with the values of the Damage extent value for the graphical evaluation in a matrix diagram.

    The parameter can be edited by users with modification rights in the following modules:

    From DB 39.5.10

    DI063823 Probability of occurrence

    Parameter for the evaluation of the probability of the monetary damage. The evaluation is done by three categories: low, medium, high. The values of the parameter are used together with the values of the Damage extent value for the graphical evaluation in a matrix diagram.

    The parameter can be edited by users with modification rights in the following modules:

    New from DB 39.5.7

    DI063823 Probability of occurrence

    Parameter for the evaluation of the probability of the monetary damage. The evaluation is done by three categories: low, medium, high. The values of the parameter are used together with the values of the Damage extent value for the graphical evaluation in a matrix diagram.

    The parameter can be edited by users with modification rights in the following modules:


    New from DB 39.5.7

    DI063819 Damage extent name

    Name of the damage extent value. For description, see Damage extent.


    New from DB 39.5.7

    DI063821 Probability of occurrence name

    Name of the probability of occurrence value. For description, see Probability of occurrence.

             PLANTA project









     
    • Suche in Topic-Namen

    • Suche in Topic-Inhalten
    This site is powered by the TWiki collaboration platform Powered by Perl