Risk Trend Analysis MOD0099N3

From DB 39.5.12

Access path

From DB 39.5.9

Access path

Up to DB 39.5.9

Access path

Information

  • In the Risk Trend Analysis module,
    • the trend of the monetary damage resulting from the project risks is displayed graphically based on the project status reports.
    • both current damage data and data from the status reports is displayed in table form and can be compared.

Details

  • The graphics contain three graphs: one each for possible, probable, and actual damage.
    • Every profile has its own color. The meaning of each color is explained in the legend below the graphic.
  • In tabular view, the reports are displayed below the active baseline sorted by report date in descending order.

Note for structured projects

  • If it is a structured project, the risk trend analysis is only displayed for the project level on which you currently are, i.e. either the risk trend analysis of the main project or that of the respective subproject.

         PLANTA project









 