The documentation from version 39.5.17 of PLANTA project can be found in the new PLANTA Online Help.

Costs by Cost Type Groups MOD009BRG New from DB 39.5.0

Description for versions < DB 39.5.0


From DB 39.5.13

Access path

From DB 39.5.9

Access path

Up to DB 39.5.9

Access path

Information

Module header

  • Cost type groups are the first grouping level. The second grouping level is Code by default but can be changed if necessary.
    • For this purpose, select the required grouping criterion from the Group by listbox and subsequently click on the Use changes button afterwards.
  • The projects to be displayed in this module can be filtered using object filters.
    • If there already is an object filter, it can be selected from the listbox on the Filter field. After you have clicked on the Use changes button, only projects which correspond to the filter will be displayed.
    • You can edit existing object filters or create new ones in the Object Filter module which is opened via the Edit filter button.
    • If a grouping criterion is selected in one of the modules which use object filters, it automatically takes effect in all other modules with object filters.

Data

  • In the sum area, effort and budget data is displayed summed over all cost type groups.
  • The sum values for effort budget and total effort are displayed in the form of pie charts segmented by cost type groups.
  • By expanding the tree structure of the respective cost type group, the corresponding projects are additionally displayed grouped by code. This grouping can be changed as described above.

Notes

  • For structured projects, the summed values of the entire project structure are displayed.

         PLANTA project









 
  • Suche in Topic-Namen

  • Suche in Topic-Inhalten
This site is powered by the TWiki collaboration platform Powered by Perl