Project Estimate MOD0099P7

From DB 39.5.9

Access path

Up to DB 39.5.9

Access path

Information

  • In this module, the project estimates created manually by the project manager (entire estimate) as well as their individual factors (costs, effort, dates, quality, risks, and opportunities) and the project status calculated by the program for the cost, effort, and date factors are displayed each from
    • the current planning,
    • the baseline report,
    • the active status report (the last released status report) as well as from
    • the previously active status report (the status report which was active before the current one)

Notes

  • The status report data is only displayed if respective status reports exist.
  • If there are structured projects among the displayed projects as well, only their main projects are displayed.

Details

  • The projects displayed in this module are grouped by Code by default. It is, however, possible to change groupings or have projects displayed ungrouped.
    • In the Group by field, you can either change the grouping criterion by making a selection from the listbox, or delete it. After you have clicked on the Use changes button, the projects are either displayed grouped by the selected criterion or they are displayed ungrouped.
    • If a grouping criterion is selected in one of the modules which use grouping criteria, it automatically takes effect in all modules with groupings.
  • By By clicking on the ID of the required project, you can switch to the corresponding Project panel in which you can edit or view the program data depending on your user rights.
  • By clicking on the report number, it is switched to the Status Report.

Module variants

Base In this variant, the estimate values and the values calculated by the program are displayed for different factors like costs, effort, dates, etc.
Trend analysis Additional trend values are displayed, which visualize the progress compared to
  • the baseline report on one hand
  • and the active status report on the other hand.

See also: Working with Module Variants