DT804 Todo Item New from DB 39.5.0
From DB 39.5.0,
open items have been renamed
todo items. Hence, the name of DT805 as well as the names of the corresponding DIs have changed. If you use a DB version < 39.5.0, please go to the
DT804OpenItems topic.
DI006450 Project ID
Technical ID of the project. It is generated automatically upon creation of the project and cannot be changed afterwards, unlike the functional ID. It is usually invisible in the modules.
DI006451 Project ID
Technical ID of the project. It is generated automatically upon creation of the project and cannot be changed afterwards, unlike the functional ID. It is usually invisible in the modules.
DI006452 Task ID
Technical ID of the task. It is generated automatically upon creation of the task and cannot be changed afterwards unlike the functional ID. It is usually invisible in the modules.
From DB 39.5.12
DI006453 Resource ID
Code (ID) of the resource which is to complete the todo item. For description, see
DI040536.
Up to DB 39.5.12
DI006453 Resource
Code (ID) of the resource which is to complete the todo item. For description, see
DI040536.
DI006454 Todo item
ID of the todo item. It is automatically generated when
creating a todo item.
DI006474 Created on
When you create a record, the creation date is automatically entered in this field.
DI006477 Created by
When you create a record, the ID (code) of the logged-on user is automatically entered in this field.
The creating user is also the
owner of a record.
DI006501 Pos.
DI006503 Start from
Date on which the completion of the todo item is to be started
DI006504 Date
Date by which the todo item is to be completed
Modifiable
From DB 39.5.10
- in the
- provided that the modifying user possesses the required rights
Up to DB 39.5.10
in the
provided that the modifying user possesses the required rights
Details
From DB 39.5.10
- A traffic light is stored on the Date field in the Todo Items, Schedule and NEW Quality Gates modules which behaves as follows:
- As long as the todo item is not completed by 100%, the traffic light is
- red if the desired end date is in the past.
- yellow if the desired end date is today.
- green if the required end date is in the future.
- As soon as the todo item is completed by 100% (entry 100% in the % completed field), the traffic light is green.
Up to DB 39.5.10
A traffic light is stored on the Date field in the Todo Items and Schedule modules which behaves as follows:
- As long as the todo item is not completed by 100%, the traffic light is
- red if the desired end date is in the past.
- yellow if the desired end date is today.
- green if the required end date is in the future.
- As soon as the todo item is completed by 100% (entry 100% in the % completed field), the traffic light is green.
DI006505 % completed
Degree of completion of the todo item in percent
Modifiable
From DB 39.5.10
- in the
- provided that the modifying user possesses the required rights
Up to DB 39.5.10
in the
provided that the modifying user possesses the required rights
Details
- In the modules mentioned above, a traffic light is stored on the % completed field which switches to green as soon as the completion degree of 100% is reached. This entry influences the behavior of the traffic lights on the Date field.
Date field.
DI006506 Linked file
In this field you can create a link to a file.
Insert file
- Right-click on the Linked file field and select the Insert context menu command.
- Click on the Search button in the Insert hyperlink window.
- Select the required file and click on the Open button.
- Confirm with OK.
- Save.
Details
- It is also possible to drag files from e.g. Window Explorer to the data field for documents using Drag & Drop.
DI006507 Category
Todo item category
Modifiable
From DB 39.5.10
- in the
- provided that the modifying user possesses the required rights
Up to DB 39.5.10
in the
provided that the modifying user possesses the required rights
Details
DI006508 Priority
Priority of the todo item
Modifiable
- in the
- provided that the modifying user possesses the required rights
DI006509 Todo item name
Name of the todo item
Modifiable
- in the
- provided that the modifying user possesses the required rights
DI006669 Calc. start
Calculated start date of the task to which the todo item is assigned
DI006670 Calc. end
Calculated end date of the task to which the todo item is assigned
DI006671 Actual start
Actual start date of the task to which the todo item is assigned
DI006672 Actual end
Actual end date of the task to which the todo item is assigned
DI006674 Task name
Name of the task to which the todo item is assigned
DI006676 Remaining duration
Remaining duration of the task to which the todo item is assigned
DI006687 Project name
Name of the project to which the todo item is assigned
DI006840 Type
DI006841 Project ID
ID of the project
DI009625 Bar: Todo item start from - date
Bar for todo dates of the todo item (
Start from,
Date)
DI023367 TDI: Counter (WB 1)
Technical data item. It is used to visualize the number of risk measures in different modules. E.g. In the
Dashboard module in the
Activities area (
Todo items up to DB 39.5.0), the number of todo items is displayed grouped by 4 statuses (
delayed,
today,
futur,
without date).
DI023375 TDI: past/present/future
Technical data item which controls the status of todo items
Values
- without date
- late
- today
- future
DI026060 Comments
You can write comments on the todo item here.
Modifiable
- in the
- provided that the modifying user possesses the required rights
From DB 39.5.12
DI040536 Resource
Name (incarnation field) of the resource which is to complete the todo item.
Modifiable
- in the
- provided that the modifying user possesses the required rights
Up to DB 39.5.12
DI040536 Resource name
Name (incarnation field) of the resource which is to complete the todo item.
Modifiable
- in the
- provided that the modifying user possesses the required rights
DI041375 Project
ID of the project to which the todo item is assigned
DI041594 Task
ID of the task to which the todo item is assigned
DI051838 Created by: name
When you create a record, the ID (code) of the logged-on user is automatically entered in this field.
The creating user is also the
owner of a record.
DI057578 Own/other items
Grouping parameters for todo items
DI058227 Parent task name
Name of the parent task
Note
- The corresponding field is hidden by default but can be displayed by the user if necessary.
DI058228 WBS code
WBS code of the task to which the todo item is assigned
Note
- The corresponding field is hidden by default but can be displayed by the user if necessary.
DI059679 Assigned to a task
Via filter criteria, this parameter controls whether the todo items in the
Schedule module are displayed below particular resources, or below tasks.
Customizing
- Data area 050753: Filter from = 1, Filter to = 99, the todo item is displayed below the resource.
- Data area 041207: Filter from = 0, Filter to = 0, the todo item is displayed below the task.
DI056993 804: OLAP
DI024867 Resource structure code
DI064116 Project/task locked
New from DB 39.5.10
DI064150 Priority name
Name of the priority of the todo item within a quality gate. Influences the calculation of the degree of completion of a quality gate
Values
Modifiable
DI064727 Position: quality gate todo item
Numerical value which determines the order of the todo items within a quality gate
Modifiable
New from DB 39.5.11
DI065037 Completed on: manager
Date, on which the process step was completed. Is set by the manager of the respective project.