DT861 Budget/Costs/Benefit per Year
New from DB 39.5.0
DI061339 Active
Via the
Active checkbox you can define whether the cost, effort, and budget values of the respective planning object are summarized to the portfolio or not. That way it can be checked how the total budget changes with or without the selected object.
Values
- - the data of the object is summarized to the portfolio
- - the data of the object is not summarized to the portfolio
DI023278 Approved budget
From DB 39.5.14
Via this parameter you can define whether the budget in the
Approved column of this yearly tranche is approved, and if so, the approved values of the yearly tranche are summarized upwards to the entire project level.
Values
- - the budget is approved and summarized upwards via the structure
- - the budget is neither approved nor summarized
Up to DB 39.5.14
In the project environment: Via this parameter you can define whether the budget in the
Approved column of this yearly tranche is approved, and if so, the approved values of the yearly tranche are summarized upwards to the entire project level.
In the portfolio environment: Via this parameter you can define whether the budget in the
Approved column of this yearly tranche is approved, and if so, the approved values of the project are summarized upwards to the portfolio.
Values
- - the budget is approved and summarized upwards via the structure
- - the budget is neither approved nor summarized
New from DB 39.5.14
DI065513 Approved budget in portfolio
Via this parameter you can define whether the budget in the
Approved column of this yearly tranche is approved, and if so, the approved values of the project are summarized upwards to the portfolio.
Values
- - the budget is approved and summarized upwards via the structure
- - the budget is neither approved nor summarized
DI041675 Total costs
From DB 39.5.0
Total costs of the project and all of its subprojects in the selected year
Details
Up to DB 39.5.0
Total costs of the project and all of its subprojects from all
cost type groups per year
From DB 39.5.0
DI028831 Planned benefit (without subprojects)
The planned benefit of the project without considering its subprojects in the selected year or as a sum of all years
Details
Up to DB 39.5.0
DI028831 Planned benefit
The planned benefit of the project without considering its subprojects
Details
From DB 39.5.0
DI023173 Benefit achieved (without subprojects)
Achieved benefit of the project without considering its subprojects in the selected year or as a sum of all years
Details
Up to DB 39.5.0
DI023173 Achieved benefit
Achieved benefit of the project without considering its subprojects.
Details
DI061227 Resulting benefit (without subprojects)
Resulting benefit of the project without considering its subprojects in the selected year or as a sum of all years
Details
DI060780 Achieved benefit
Sum of the
Achieved benefit (without subprojects) values of the project and all of its subprojects in the selected year or as a sum of all years
Details
DI060779 Planned benefit
Sum of the
Achieved benefit (without subprojects) values of the selected project and all of its subprojects in the selected year or as a sum of all years
Details
DI060778 Resulting benefit
The resulting benefit of the selected project and all of its subprojects in the selected year or as a sum of years
Details
The
Resulting benefit value is either the
Achieved benefit (without subprojects) value, if it exists, or otherwise the
Planned benefit value.
DI060777 Deviation revenues - costs
Deviation of the
Total revenues from
Total costs in the selected year
or as a sum of all years
DI061361 Total costs (without subprojects)
Total costs of the selected project without considering its subprojects. The value is fetched from the
Total costs DI from
DT282.
DI061229 revenues - costs deviation (without subprojects)
Deviation:
Total revenues (without subprojects) from
Total costs (without subprojects)
DI061225 Total revenues (without subprojects)
Total revenues of the project without considering its subprojects in the selected year or as a sum of all years
Calculation
DI061222 Planned revenues (without subprojects)
Initially planned revenues of the selected project without considering its subprojects in the selected year or as a sum of all years
Details
- Planned revenues of a project are only displayed if revenue resources are planned on the tasks in this project (Schedule module).
DI061223 Remaining revenues (without subprojects)
Remaining revenues of the selected project without considering its subprojects in the selected year or as a sum of all years
Details
- Remaining revenues of a project are only displayed if revenue resources are planned on the tasks in this project (Schedule module).
DI061224 Actual revenues (without subprojects)
Actual revenues of the selected project without considering its subprojects in the selected year or as a sum of all years
Details
- Actual revenues of a project are only displayed if revenue resources are planned on the tasks in this project (Schedule module) and actual values are created for them (Revenue Posting module).
DI041660 Planned revenues
Remaining revenues of the selected project and all of it subprojects
Planned revenues (without subprojects) values of the project and all of its subprojects in the selected year or as a sum of all years
Details
- Remaining revenues of a project are only displayed if revenue resources are planned on the tasks in this project (Schedule module).
DI041661 Actual revenues
Actual revenues of the selected project and all of it subprojects
Planned revenues (without subprojects) values of the project and all of its subprojects in the selected year or as a sum of all years
Details
- Actual revenues of a project are only displayed if revenue resources are planned on the tasks in this project (Schedule module) and actual values are created for them (Revenue Posting module).
DI041662 Remaining revenues
Remaining revenues of the selected project and all of its subprojects
Planned revenues (without subprojects) values of the project and all of its subprojects in the selected year or as a sum of all years
Details
- Remaining revenues of a project are only displayed if revenue resources are planned on the tasks in this project (Schedule module).
DI041663 Total revenues
Total revenues of the selected project in the selected year or as a sum of all years
Calculation
Details
DI061228 Benefit - costs deviation (without subprojects)
Deviation:
Resulting revenues (without subprojects) from
Total costs (without subprojects)
DI061226 Benefit - costs deviation
Deviation:
Resulting benefit (without subprojects) from
Total costs (without subprojects)
DI023062 Year
In this field, the year of the yearly tranche is displayed.
DI023076 Project ID
Technical ID of the project. Is generated automatically when the project is created. Unlike the functional ID in the
Project DI, it cannot be changed. It is usually invisible in the modules.
DI023119 Project ID
Technical ID of the project. Is generated automatically when the project is created. Unlike the functional ID in the
Project DI, it cannot be changed. It is usually invisible in the modules.
DI040331 Project name
Here, the name of the project that is included in the selected portfolio and has budget and cost values in the selected period, is displayed.
DI059269 HT: Approved
Help text: Approved
DI059270 HT: Requested
Help text: Requested
DI059125 HT: Baseline
Help text: Baseline
DI059126 HT: total
Help text: total
DIs no longer used from DB 39.5.0
The DIs listed below are no longer used from DB version 39.5.0.
DI023305 Requested/approved: total
Requested or approved budget total
DI028583 Status report: Planned revenues
Planned revenues from the last released status report
DI028584 Status report: Actual revenues
Actual revenues from the last released status report
DI028585 Status report: Remaining revenues
Remaining revenues from the last released status report
DI028586 Status report: Total revenues
Total revenues from the last released status report
DI023160 Cost budget requested
Total budget requested
Calculation
DI023161 Cost budget approved
Budget total requested
Calculation
DI023165 Effort budget requested internal
Requested resource effort for the Internal Resource type
DI023166 Effort budget requested external
Requested resource effort for the External Resource type
DI023167 Status report: actual effort: internal
Actual effort of the Internal resource type from the last released status report.
DI023168 Status report: actual effort: external
Actual effort of the External resource type from the last released status report.
DI023169 Status report: actual costs
Sum of all actual costs from the last released status report.
Calculation
DI023170 Status report: remaining costs
Sum of all remaining costs from the last released status report.
Calculation
DI023171 Status report: actual effort
Sum of the actual effort of the Internal and External resource types from the last released status report.
Calculation
DI023172 Status report: remaining effort
Sum of the remaining effort of the Internal and External resource types from the last released status report.
Calculation
DI023174 Status report: remaining effort: internal
Remaining effort of the Internal resource type from the last released status report.
DI023175 Status report: remaining effort: external
Remaining effort of the External resource type from the last released status report.
DI023176 Effort budget requested
Requested resource effort total
DI023177 Effort budget approved
Resource effort approved
DI023178 Effort budget approved: internal
Approved resource effort for the Internal resource type
DI023179 Effort budget approved: external
Approved resource effort for the External resource type
DI028558 Requested cost budget: internal personnel
Requested budget for the Internal personnel cost type group.
DI028559 Status report: planned costs: internal personnel
Planned costs of the Internal personnel cost type group from the last released status report.
DI028560 Status report: actual costs: internal personnel
Planned costs of the Internal personnel cost type group from the last released status report.
DI028561 Status report: remaining costs: internal personnel
Remaining costs of the Internal personnel cost type group from the last released status report.
DI028562 Status report: total costs: internal personnel
Total costs of the Internal personnel cost type group from the last released status report.
DI028563 Requested cost budget: external personnel
Requested budget for the External personnel cost type group.
DI028564 Status report: planned costs: external personnel
Planned costs of the External personnel cost type group from the last released status report.
DI028565 Status report: actual costs: external personnel
Planned costs of the Internal personnel cost type group from the last released status report.
DI028566 Status report: remaining costs: external personnel
Remaining costs of the External personnel cost type group from the last released status report.
DI028567 Status report: total costs: external personnel
Total costs of the External personnel cost type group from the last released status report.
DI028568 Requested cost budget: material costs
Requested budget for the Material costs cost type group.
DI028569 Status report: planned costs: material costs
Planned costs of the Material costs cost type group from the last released status report.
DI028570 Status report: actual costs: material costs
Actual costs of the Material costs cost type group from the last released status report.
DI028571 Status report: remaining costs: material costs
Remaining costs of the Material costs cost type group from the last released status report.
DI028572 Status report: total costs: material costs
Total costs of the Material costs cost type group from the last released status report.
DI028573 Requested cost budget: investments
Requested budget of the Investments cost type group.
DI028574 Status report: planned costs: investments
Planned costs of the Investments cost type group from the last released status report.
DI028575 Status report: actual costs: investments
Actual costs of the Investments cost type group from the last released status report.
DI028576 Status report: remaining costs: investments
Remaining costs of the Investments cost type group for the respective status report.
DI028577 Status report: total costs: investments
Total costs of the Investments cost type group from the last released status report.
DI028578 Requested cost budget: miscellaneous
Requested budget of the Miscellaneous cost type group.
DI028579 Status report: planned costs: miscellaneous
Planned costs of the Miscellaneous cost type group from the last released status report.
DI028580 Status report: actual costs: miscellaneous
Actual costs of the Miscellaneous cost type group from the last released status report.
DI028581 Status report: remaining costs: miscellaneous
Remaining costs of the Miscellaneous cost type group from the last released status report.
DI028582 Status report: total costs: miscellaneous
Total costs of the Miscellaneous cost type group from the last released status report.
DI028587 Status report: Deviation external personnel
Percentage deviation of the cost budget from the total costs of the External personnel cost type group from the last released status report.
DI028588 Status report: Deviation material costs
Percentage deviation of the cost budget from the total costs of the Material costs cost type group from the last released status report.
DI028589 Status report: Deviation investments
Percentage deviation of the cost budget from the total costs of the Investments cost type group from the last released status report.
DI028590 Status report: Deviation miscellaneous
Percentage deviation of the cost budget from the total costs of the Miscellaneous cost type group from the last released status report.
DI028591 Status report: Deviation Internal personnel
Percentage deviation of the cost budget from the total costs of the Internal personnel cost type group from the last released status report.
DI028592 OLE miscellaneous
OLE symbol for the Miscellaneous cost type group.
DI028593 OLE investments
OLE symbol for the Investments cost type group
DI028594 OLE material costs
OLE symbol for the Material costs cost type group
DI028595 OLE external personnel
OLE symbol for the External personnel cost type group
DI028596 OLE Personal intern
OLE symbol for the External personnel cost type group
DI034472 Status report: planned effort: internal
Planned effort of the Internal resource type from the last released status report.
DI034473 Status report: planned effort: external
Planned effort of the External resource type from the last released status report.
DI034474 Status report: total effort: internal
Total effort of the Internal resource type from the last released status report.
DI034475 Status report: total effort: external
Total effort of the External resource type from the last released status report.
DI040198 Cost budget approved: internal personnel
Approved budget of the Internal personnel cost type group for the respective year.
DI040199 Cost budget approved: external personnel
Approved budget of the External personnel cost type group for the respective year.
DI040200 Cost budget approved: material costs
Approved budget of the Material costs cost type group for the respective year.
DI040201 Cost budget approved: investments
Approved budget of the Investments cost type group for the respective year.
DI040202 Cost budget approved: miscellaneous
Approved budget of the Miscellaneous cost type group for the respective year.
DI040213 Status report: planned costs
Sum of all planned costs from the last released status report.
Calculation
DI040214 Status report: total costs
Sum of all total costs from all cost type groups from the last released status report.
Calculation
DI040257 VDI budget approved: internal personnel
Approved budget for the Internal personnel cost type group.
Calculation
DI040258 VDI budget approved: external personnel
Approved budget for the External personnel cost type group.
Calculation
DI040259 VDI budget approved: material costs
Approved budget for the Material costs cost type group.
Calculation
DI040260 VDI budget approved: investments
Approved budget for the Investments cost type group.
Calculation
DI040261 VDI budget approved: total
Approved budget for the Miscellaneous cost type group.
Calculation
DI040262 VDI budget approved: miscellaneous
Approved budget for the Miscellaneous cost type group.
Calculation
DI040282 Active
Via the Active checkbox next to the planning object, you can define whether the values of this object are to be summarized upwards. That way it can be checked how the total budget changes with or without the selected object.
Values
- - the data of the object are summarized in the portfolio
- - the data of the object are not summarized in the portfolio
DI041579 Cost budget baseline: internal personnel
Summarized budget for the Internal personnel cost type group. The value is shown as soon as the first baseline is created.
DI041580 Cost budget baseline: external personnel
Summarized budget for the External personnel cost type group. The value is shown as soon as the first baseline is created.
DI041581 Cost budget baseline: material costs
Summarized budget for the Material costs cost type group. The value is shown as soon as the first baseline is created.
DI041582 Cost budget baseline: investments
Summarized budget for the Investments cost type group. The value is shown as soon as the first baseline is created.
DI041583 Cost budget baseline: miscellaneous
Summarized budget for the Miscellaneous cost type group. The value is shown as soon as the first baseline is created.
DI041584 Cost budget baseline
Summarized budget total. The value is shown as soon as the first baseline is created.
Calculation
DI041589 Effort budget baseline
Total effort budget. The value is shown as soon as the first baseline is created.
DI041590 Effort budget baseline: internal
Effort budget for the Internal.resource type. The value is shown as soon as the first baseline is created.
DI041591 Effort budget baseline: external
Effort budget for the External.resource type. The value is shown as soon as the first baseline is created.
DI041622 Status report liability: internal personnel
Total costs of the Internal personnel cost type group from the last released status report.
Details
DI041623 Status report liability: external personnel
Liability of the External personnel cost type group from the last released status report.
Details
DI041624 Status report liability: material costs
Liability of the Material costs cost type group from the last released status report.
Details
DI041625 Status report liability: investments
Liability of the Investments cost type group from the last released status report.
Details
DI041626 Status report liability: miscellaneous
Liability of the Miscellaneous cost type group from the last released status report.
Details
DI041627 Planned effort: internal
Planned effort for the Internal resource type
DI041628 Actual effort: internal
Actual effort for the Internal resource type
DI041629 Remaining effort: internal
Remaining effort for the Internal resource type
DI041630 Total effort: internal
Total effort for the Internal resource type
DI041631 Planned effort: external
Planned effort for the External resource type
DI041632 Actual effort: external
Actual effort for the External resource type
DI041633 Remaining effort: external
Remaining effort for the External resource type
DI041634 Total effort: external
Total effort for the External resource type
DI041635 Planned costs: internal personnel
Planned costs of the Internal personnel cost type group
Details
- Costs result from the multiplication of resource efforts with the conversion factors.
DI041636 Actual costs: internal personnel
Actual costs of the Internal personnel cost type group
Details
DI041637 Rem. costs: internal personnel
Remaining costs of the Internal personal cost type group
Details
DI041638 Liability: internal personnel
Liability for the Internal personnel cost type group Internal personnel.
Details
- A liability is a contractual or optional obligation leading to actual costs due to business transactions like goods input or invoice receipt.
- In finance, the term liability is used for the payment obligations of a company.
- Liability does not only include the liabilities already gathered (e.g. through received but not yet payed bills), but also all future payment obligations (e.g. due to contractual agreements).
DI041639 Total costs: internal personnel
Total costs of the Internal personnel Cost Type Group
Details
DI041640 Planned costs: external personnel
Planned costs of the External personnel cost type group
Details
DI041641 Actual costs: external personnel
Actual costs of the External personnel cost type group
Details
DI041642 Rem. costs: external personnel
Remaining costs of the External personnel cost type group
Details
DI041643 Liability: external personnel
Liability for the External personnel cost type group
Details
DI041644 Total costs: external personnel
Total costs of the External personnel cost type group
Details
DI041645 Planned costs: material costs
Planned costs of the Material costs cost type group
Details
DI041646 Actual costs: material costs
Actual costs of the Material costs cost type group
Details
DI041647 Rem. costs: material costs
Remaining costs of the Material costs cost type group
Details
DI041648 Liability: material costs
*
Liability for the Material costs cost type group
Details
DI041649 Total costs: material costs
Total costs of the Material costs cost type group
Details
DI041650 Planned costs: investments
Planned costs of the Investments cost type group
Details
DI041651 Actual costs: investments
Actual costs of the Investments cost type group
Details
DI041652 Rem. costs: investments
Remaining costs of the Investments cost type group
Details
DI041653 Liability: investments
Liability of the Investments cost type group.
Details
DI041654 Total costs: investments
Total costs of the Investments cost type group
Details
DI041655 Planned costs: miscellaneous
Planned costs of the Miscellaneous cost type group
Details
DI041656 Actual costs: miscellaneous
Actual costs of the Miscellaneous cost type group
Details
DI041657 Rem. costs: miscellaneous
Remaining costs of the Miscellaneous cost type group
Details
DI041658 Liability: miscellaneous
Liability for the Miscellaneous cost type group
Details
DI041659 Total costs: miscellaneous
Total costs of the Miscellaneous cost type group
DI041664 Status report: product in process
DI041665 Product in process
DI041666 Status report: planned benefit
Planned benefit from the last released status report
Details
DI041667 Status report: achieved benefit
Achieved benefit from the last released status report
Details
DI041671 Planned costs
Summarized planned costs from all cost type groups.
Calculation
DI041672 Actual costs
Summarized planned costs from all cost type groups.
Calculation
DI041673 Rem. costs
Summarized remaining costs from all cost type groups.
Calculation
DI041674 Liability
Sum of all liabilities from all cost type groups.
Details
Calculation
DI041676 Planned effort
Total planned effort for the Internal and External resource types.
DI041677 Actual effort
Actual effort for the Internal and External resource types .
DI041678 Remaining effort
Remaining effort for the Internal and External resource types.
DI041679 Total effort
Total effort for the Internal and External resource types.
DI057808 Benefit costs
Deviation benefit from total costs
DI057809 Revnues costs
Deviation benefit from total costs
DI056901 Status report: liability
Sum of all liabilities from all cost type groups for the respective status report.
Details
DI057810 Status report: benefit - costs
Deviation of the total costs from the total revenues from the last released status report.
DI057811 Status report: revenues - costs
Deviation of the total costs from the total revenues from the last released status report.
DI057812 Status report: planned effort
Sum of the remaining effort of the Internal and External resource types from the last released status report.
Calculation
DI057813 Status report: total effort
Total effort of the Internal and External resource type from the last released status report.
Calculation
DI059003 VDI effort budget approved: internal
Approved effort for the Internal resource type.
Calculation
DI059004 VDI effort budget approved: external
Approved effort for the External resource type.
Calculation
DI059005 VDI effort budget approved: total
Approved total effort of the Internal and External. resource type
Calculation
DI059114 Portfolio budget approved/requested: internal personnel
Summarized budget of the portfolio planning objects for the Internal personnel cost type group. The values in this field are dependent on the values in the Active and Approved budget fields.
DI059113 Portfolio budget approved/requested: external personnel
Summarized budget of the portfolio planning objects for the External personnel cost type group. The values in this field are dependent on the values in the Active and Approved budget fields.
DI059112 Portfolio budget approved/requested: material costs
Summarized budget of the portfolio planning objects for the Material costs cost type group. The values in this field are dependent on the values in the Active and Approved budget fields.
DI059111 Portfolio budget approved/requested: investments
Summarized budget of the portfolio planning objects for the Investments cost type group. The values in this field are dependent on the values in the Active and Approved budget fields.
DI059109 Portfolio budget approved/requested: miscellaneous
Summarized budget of the portfolio planning objects for the Miscellaneous cost type group. The values in this field are dependent on the values in the Active and Approved budget fields.
DI059110 Portfolio budget approved/requested: total
Total summarized budget of the portfolio planning objects for the Miscellaneous cost type group. The values in this field are dependent on the values in the Active and Approved budget fields.