DT400 Miscellaneous Objects
Data table 400 summarizes data items which are used to map special customizing objects, e.g. buttons, linkage routes, etc.
DI057574 »
From DB 39.5.0
Arrow button for switching the values of a parameter. The use (parameter reference) and the name of this button can be different in different modules.
Examples
- Change note arrow button, e.g. in the WBS and Schedule modules.
- Change estimate arrow button in the Status module.
- Fill from approved budget arrow button in the Budget module
- etc.
Up to DB 39.5.0
Arrow button for execution of several actions. The usage and the name of the button can be different in different modules.
Examples
- Change note arrow button, e.g. in the WBS and Schedule modules.
- Change estimate arrow button in the Status module.
- Fill from approved budget arrow button in the Budget module.
- etc.
DI059754 Object
Field which can be be used in different modules and for different purposes.
DI002157 DDI for sum areas
Determining data item for sum values
DI004336 Button/IronPython
Data item which is used to customize different module elements which have actions stored on them, e.g. buttons, context menus, etc.
See also: Customize Actions
DI025581 Background
Data item which can be used as a placeholder for different purposes, e.g.
- to place individual texts, headings, images (OLEs) at desired positions in the module (area headings in the Project Core Data module)
- to customize spaces between particular objects (space between budget and cost columns in the Budget module)
- etc.
DI002070 Link/network linkage
Data item for the visualization of the linkage between objects in the predecessor-successor relationship. It is used in modules with links/network plans, e.g. in the
Schedule module.
See also: Complex Module Constructions
Scale Data Items
The following data items are used to visualize different scale grids, e.g. day, month, etc., in modules with scales.
- DI000913 Scale day
- DI002099 Scale year
- DI002100 Scale month
- DI002101 Scale calendar week
- DI009049 Scale quarter
Projection Data Items for Values from DT468
The following data items are used for projected display of the respective values (available capacity, utilization, planned, etc.) of the resources per period (day) from the current planning (DT468) below the scale, e.g. in modules with utilization diagram, e.g.
Resource Planning or
My Department
- DI002496 Projection available capacity
- DI002497 Projection utilization
- DI002512 Projection planned
- DI002516 Projection used
- DI059506 Projection % utilization (468)
Projection data items for values from DT472
The following data items are used for projected display of the respective values (effort/load, overload, costs, revenues) of the load records from the current planning (DT472) below the scale, e.g. in modules in which values are additionally represented below the scale, e.g. in the
Time Recording module
- DI002096 Projection planned load
- DI002104 Projection actual load
- DI002105 Projection remaining load
- DI007128 Projection total-load
- DI000847 Projection load planned-costs
- DI000848 Projection load actual-costs
- DI000849 Projection load remaining-costs
- DI000850 Projection load total-costs
- DI040998 Projection total revenues
- DI059504 Projection overload (472)
See also: Complex Module Constructions,
Customizing of Scale Objects
Projection Data Items for Costs from 827 (without distinction of costs vs. revenues resource type)
The following data items are used for projected display of the cost values of the project from the selected status report (which are stored in load report data table 827) below the scale, e.g. in the
Cost Trend Analysis module. As far as the cost value is concerned, no distinction is made between costs and revenues. Compare the following groups with two projection DIs which represent the cost and revenues values independent of one another.
- DI034411 Projection planned costs 827
- DI034412 Projection actual costs 827
- DI034413 Projection remaining costs 827
- DI034414 Projection total costs 827
Projection Data Item for Costs from 827 (with a distinction of cost vs. revenues resource type)
The following data items are used respectively for projected display of cost and revenue values of the project from the selected status report (which are stored in load report data table 827) below the scale, e.g. in the
Costs and Revenues per Month module.
- DI029140 827: Projection total costs
- DI029527 Projection total revenues 827
Projection Data Item for Effort from 827
The following data items are used for projected display of the cost values of the project from the selected status report (which are stored in load report data table 827) below the scale, e.g. in the
Effort Trend Analysis module.
- DI034503 Projection planned effort 827
- DI034504 Projection actual effort 827
- DI034505 Projection remaining effort 827
- DI034506 Projection total effort 827
Projection Data Items for Vacation and Absence
The following data items are used for projected display of vacation and absence values below the scale, e.g. in the
Absence or
Absence of the department
- DI002541 Projection vacation
- DI002542 Projection absence
- DI066004 Projection vacation/absence incl. subresources
DI051880 Projection actual load DT085
Data item for projected display of the
Actual load value from DT085
DI002120 Histogram scale (N8)
DI002158 Scale month grid line
DI002539 Scale day vacation planning
DI002160 Scale day GL
New from S 39.5.12
DI063250 Paging: Jump to page
In this field, you can enter to which page you want to jump.
The parameter can be edited by users with modification rights in the following module:
New from S 39.5.12
DI063251 Paging: Records per page
In this field you can specify the number of records to be displayed on a page.
The parameter can be edited by users with modification rights in the following module: